Our civil engineer Jerry Perales (http://peraleseng.com/) did the completeness check submission to the City of Austin. So the design phase of the project is over and we started the process of obtaining formal approval for the site development and construction. Our architect William Lawrence Hodge is working on construction drawings in conjunction with the structural engineer Michael Donoghue from Maritech Engineering, Inc.
Soils Investigation Report was completed by Greentrack Drilling http://greentrackdrilling.com
Two boreholes were drilled to the depth of 28 feet and based on the result of drilling and pits that were done earlier by Geotechnical Engineering Report was prepared by Triax Engineering.
As we decided to go ahead with green roof, design was changed to accommodate that
So we will have a lot of mature trees on the site plus the roofs will have more greenery. Therefore the name Enfield Gardens.